Captive load
What this case shows
- A restricted sink is served from its allowed sources before anything unrestricted shares them.
- Serving the captive sink first pushes the unrestricted base load onto the grid.
- A draw the allowed sources cannot cover is still attributed, and the shortfall is reported as a restriction deficit.
Each snapshot below is one set of readings on this wiring, drawn as a flow chart — how to read it.
Captive load
pv1 makes more than cons1 draws, so cons1 runs on solar alone and the base load is pushed onto the grid.
| Reading | W | Of gross | Share | Made of |
|---|---|---|---|---|
| Gross power | 1400 W | 1 | grid 800 W · pv1 600 W | |
| Grid import | 800 W | 4/7 | grid 800 W | |
| Grid export | 0 W | 0 | nothing exported | |
| PV production | 600 W | 3/7 | pv1 600 W | |
| Charging power | 0 W | 0 | no battery charging | |
| Discharging power | 0 W | 0 | no battery discharging | |
| Standby power | 0 W | 0 | no standby draw | |
| Self-consumption | 1400 W | 1 | grid 800 W · pv1 600 W | |
| Metering imbalanceok | 0 W | 0 | readings reconcile exactly | |
| Home base load | 900 W | 9/14 | unmetered remainder of consumption |
Load exceeds supply
cons1 draws 500 W but pv1 makes only 300 W: the missing 200 W came from a source it is not allowed to use.
| Reading | W | Of gross | Share | Made of |
|---|---|---|---|---|
| Gross power | 1100 W | 1 | grid 800 W · pv1 300 W | |
| Grid import | 800 W | 8/11 | grid 800 W | |
| Grid export | 0 W | 0 | nothing exported | |
| PV production | 300 W | 3/11 | pv1 300 W | |
| Charging power | 0 W | 0 | no battery charging | |
| Discharging power | 0 W | 0 | no battery discharging | |
| Standby power | 0 W | 0 | no standby draw | |
| Self-consumption | 1100 W | 1 | grid 800 W · pv1 300 W | |
| Metering imbalanceok | 0 W | 0 | readings reconcile exactly | |
| Home base load | 600 W | 6/11 | unmetered remainder of consumption |
Why this case exists
Three adapters is the smallest wiring in which a restriction can be honoured, and — one reading later — the smallest in which one can fail. Both belong here rather than further up the ladder, because with three devices you can follow every watt of the deficit by eye.
When the PV system covers the captive load, the rule is visible in one line:
cons1 runs on solar alone, and the unrestricted base load is pushed onto the
grid to make room. A naive implementation that shared each source in proportion
would hand cons1 a slice of grid power it is not permitted to touch, and give
the base load solar it has no priority claim to. The two implementations
separate immediately.
The second snapshot asks what happens when the restriction is simply not true.
cons1 draws 500 W and its only permitted source makes 300 W. The engine does
not refuse to answer and does not silently pretend the extra 200 W was solar —
it attributes the draw as the meters actually show it and reports the 200 W as
a restriction deficit. That figure is not an engine failure. It is the
engine saying the meters disagree with how you told it your energy manager
behaves.