This page records the non-obvious modelling decisions baked into the PowerInsight calculation engine (custom_components/power_insight/power_insight.py). These are choices where more than one answer is defensible; writing them down keeps the engine, the tests, and future changes honest about why a number comes out the way it does.

Each decision below is stated as what the engine does and why, with a worked example where the arithmetic is not obvious.

Conventions this builds on​

  • Sign convention (see Core concepts): grid + import / - export; PV/battery + produce/discharge / - standby/charge; consumer - = load.
  • Flow roles. Each snapshot every adapter is classified from its signed power into a FlowRole (SOURCE, SINK, IDLE, UNKNOWN). A battery is a source while discharging and a sink while charging; PV is a source while producing and a sink while drawing standby; a consumer is always a sink (a positive reading is reported IDLE, never SOURCE).
  • Grid as the balancing node. The grid keeps its own group (grid_adapters) and is folded into source_adapters / sink_adapters direction-aware — it joins the sources only while importing and the sinks only while exporting — so the two groups stay disjoint and the grid is never counted twice. The behind-the-meter subsets are local_source_adapters / local_sink_adapters.

Gross power and its shares​

gross_power = grid_import + PV_production + battery_discharge — the sum of the source-adapter readings.

note
Decision: gross power is None if any inflow sensor is unavailable

gross_power returns None when any grid / PV / battery power sensor is unavailable, because the total would otherwise silently under-count. A consumer sensor dropping out does not invalidate it (consumers are not sources). Everything gated on gross_power (the share vectors, the source provenance) then propagates None / {} rather than a wrong number.

source_adapters_gross_power_shares sums to 1. sink_adapters_gross_power_shares need not sum to 1 — the remainder up to 1 is the unmetered home base load (everything the metered sinks don't account for). Both guard the zero-gross case (a pure-export snapshot where gross_power == 0) by returning zeros instead of dividing by zero.

Source provenance: sink_adapters_source_shares​

For every drawing adapter, the fraction of its power supplied by each source ({sink_uid: {source_uid: share}}), each row summing to 1 — or to 0 when every source the sink is allowed happens to be idle. This honours the per-device source restrictions (power_source_uids: a battery's charge_from_adapters, a consumer's power_from_adapters).

It is a transportation problem​

Sources have a fixed output, sinks have a fixed draw, some pairings are forbidden, and the totals must match on both sides. Two extra facts shape the solve:

  • The home base load takes part. Everything consumed without a sensor on it is gross − Σ metered draws. It is unrestricted, competes for power like any other sink, and has no adapter — so it shapes every result but never appears in one.
  • The answer is not unique. Many allocations satisfy the totals, so the engine has two jobs: find allocations that are valid at all, and pick one.
note
Decision: feasibility is decided for groups, with max flow

A set of sinks can collectively exhaust the sources it is allowed while no single member is individually stuck. Two batteries each restricted to (east, west) and each drawing 100 W are individually fine — either string could cover either battery — but together they need every watt the two strings make, so a third sink allowed to use east must not touch it.

Asking "what must this sink take from this source?" one sink at a time cannot see that, and no local patch fixes it: it is Hall's condition, which quantifies over every subset. The engine therefore decides feasibility with max flow, where a minimum cut names the bottleneck group directly.

Two consequences are visible in the code. _tight_set finds a group whose draw exactly exhausts every source it may use — such a group has no freedom, so it is split off and solved on its own before anything flexible can take supply it needed. _exact_reserves asks the group question per pairing, by deleting one pairing and re-running the flow.

Choosing among valid allocations​

Feasibility usually leaves freedom. Three rules spend it, in this order:

  1. The grid goes first. A restricted sink that is allowed the grid draws it before competing for local generation. The grid is the balancing node, not a generator; local generation is the scarce thing worth attributing carefully.
  2. Scarce sources are split in proportion to draw. Which is also what makes two sinks with the same restriction come out with the same row whatever their draws — the split is proportional, never sink-by-sink, so there is no ordering for them to diverge on.
  3. Unrestricted sinks take what is left. Including the home base load. They can always be served, so they are served last.
note
Decision: a sink splits over what is left, not over total output

When a restricted sink spreads its draw across the several sources it is allowed, the weights are those sources' remaining power — what tighter restrictions have not already claimed — not their full readings.

It matters whenever restrictions nest. With pv_1 3000 and bat_1 400 available, a consumer captive to pv_1 drawing 250 W, and an export of 1200 W allowed both sources: the consumer is served first, so the export splits 2750 : 400 and reads pv_1 55/63, not the 15/17 that total output would give. Weighting by total output would let a flexible sink take supply a captive one still needed, which is the same starvation _tight_set exists to prevent.

Decision: feasibility outranks all three

They genuinely conflict. In one snapshot the only valid allocation required a battery to take more grid than the proportional split would have given it. When that happens the rules give way — they only ever choose among allocations that already work.

Decision: a broken restriction is reported, not hidden

A sink's allowed sources are a statement about how the user believes their energy manager behaves, not a fact about wiring. When the meter disagrees — a "PV only" battery drawing more than PV produced — the restriction is relaxed as a last resort, because the watts came from somewhere and leaving them unattributed would break the source totals.

How much that was is published as sink_adapters_restriction_deficit, and surfaced as a restriction_deficit attribute on the device's operating-cost sensors. It is the most useful thing an attributional engine can say: your energy manager is not doing what you configured. A sink whose allowed sources are all idle is the one exception — it collapses to an all-zeros row rather than being forced onto sources the user excluded, and its whole draw is reported as the deficit.

Decision: the sink with somewhere else to go is the one that yields

Restrictions can conflict badly enough that no allocation honours them all, and then more than one way of breaking them costs the same. Two strings of 100 W each; bat_a and bat_b allowed both and drawing 100 W each; bat_c allowed only the east string and drawing 100 W. Captive demand is 300 W against 200 W of local supply, so 100 W of restriction must break — but it could break on bat_c alone, or 50 W each on bat_a and bat_b, and both come to the same total.

The engine serves the most constrained sink first: bat_c takes the east string outright and the deficit falls on bat_a and bat_b, evenly.

Two reasons. It tells the more plausible story — a device with exactly one permitted source, and that source producing, is almost certainly using it, while a device with two permitted sources that are jointly exhausted is the one that must have gone elsewhere. And it is continuous: as bat_c's draw rises from 0 to 100 W the deficit grows smoothly from nothing to 50 W a side, with no jump. These numbers drive live sensors, and a share that snaps between 0 and 1 as a battery ramps would be worse than one that slides.

Note this is a different question from the one above. There, a tight group holds off a flexible sink that could have taken local power. Here every contender is captive and the configuration is simply unsatisfiable, so the question is not who is served but who is blamed.

Pinned by the anchor case A-003 / unsatisfiable_overlap.

Worked example — grid +400, pv_1 1000, pv_2 600 (gross 2000); bat_1 on grid+pv_1 and bat_2 on grid+pv_2 drawing 400 W each; bat_3 and cons_1 on PV only, 500 W each; home base load 200 W.

  • Neither bat_1 nor bat_2 is forced onto the grid — either string could cover its own battery on its own — so neither reserves any of it, and the 400 W import splits in proportion to their (equal) draws: 200 W each.
  • Each covers its remaining 200 W from its own string, so both read grid 0.5 / own string 0.5.
  • That leaves pv_1 800 + pv_2 400 for bat_3 500 + cons_1 500 + home 200, which is exactly 1200 W, so those three read pv_1 2/3, pv_2 1/3.
  • Columns balance to the watt: grid 400, pv_1 1000, pv_2 600.

The asymmetry between an abundant and a scarce string is real, but it lands on which string each battery keeps — not on how they divide a shared import.

The monetary model​

Every monetary result in the engine is one of three things, and keeping them apart is what makes the numbers add up:

LedgerQuestion it answersSign
CostWhat did this energy cost me?always ≥ 0
Avoided costWhat would this energy have cost from the grid?always ≥ 0
SavingCost avoided minus cost incurredeither sign

The first two are gross quantities; only the third is a P&L. They are published side by side, and two of them measure the same watts from opposite ends — see the duality warning below.

Cost follows the channels​

Gross power is partitioned into four channels (EXP / CON / CHG / STB), so the cost of gross power partitions the same way. Each channel's cost is the watts routed into it, priced at the cost of whichever source supplied them — the routing is the provenance allocation, not a proportional guess.

Decision: the channel cost buckets are the cost ledger

combined_consumption_cost_rate, combined_charging_cost_rate, combined_standby_cost_rate and combined_export_cost_rate (each with a levelized twin) replace the single "total operating cost". They exist because the four channels are the only cost split that conserves:

Invariant — cost conservation. CON + CHG + STB + EXP == combined_lcoe_rate, and likewise for the marginal (coe) variants. Every watt of gross power is bought once and lands in exactly one channel.

Decision: operating cost has a channel view and a device view

They are different questions and both are worth answering, so both exist under names that say which is which:

  • Channel — combined_charging_cost_rate is the CHG channel alone: what went into the batteries. It is one of the four buckets above, so it takes part in cost conservation.
  • Device — combined_device_operating_cost_rate is every PV's and battery's own draw, so battery charging plus PV standby (CHG + STB). It answers "what does running my hardware cost", and it is what the per-device operating-cost sensors sum to.

They agree exactly whenever nothing is in standby, which is most of the daylight hours anyone watches a dashboard — which is why a single name covering both went unnoticed. Overnight it inverts: charging is zero while standby is not, so the channel figure reads 0.00 while the device total keeps climbing.

The accumulating combined_total_levelized_device_operating_cost belongs to the device view. It is deliberately not an integrated combined rate: it is derived from the per-device totals plus the retired-adapter ledger, which is what makes lifetime-cost corrections retroactive and stops a removed device dropping its history.

The pre-existing combined_total_operating_cost measured the CHG channel alone while being named as if it covered everything, which is why per-device operating costs never summed to it. It is replaced outright by combined_total_charging_cost — a clean break rather than a rename, so the accumulated history does not carry over. The integration is still in development, so no repair issue is raised for it. CON, STB and EXP are new quantities and start from zero.

Savings are booked per device, at the moment they are realized​

Decision: a battery's energy cost is booked when it charges

A battery charging is spending money now for a benefit later. The engine books the spend at charge time — the CHG bucket — and then values the discharge at the full grid price it displaces, carrying only the battery's own LCOS as the cost of that discharge.

The alternative (defer the charging cost and net it against the discharge) needs the engine to remember what the stored energy cost, which a snapshot model cannot do. Booking at charge time is exact per snapshot and correct over a full cycle: charge −(kWh × mix price), discharge +(kWh × (grid − LCOS)), and round-trip losses show up honestly as the difference between the two energies.

adapters_saving_rates is keyed by every PV and battery, in every flow role, and a device with nothing to contribute reads 0.0 rather than being absent — so a sensor never flips unavailable just because its device went idle:

  • producing / discharging into CON → + delivered × (grid price − own cost)
  • charging / drawing standby → − drawn × (cost of its source mix)
  • exporting → + export compensation, and levelized, − exported × own LCOE
Decision: consumers do not get a saving, they get an avoided cost

A consumer running on PV is the same saved euro as the PV supplying it. It is published on both sides because both are useful — "which device earned it" and "which device benefited" — but they are two views of one quantity.

Invariant — savings additivity. Σ adapters_saving_rates == combined_saving_rate (and the levelized twin). Only the source side is summed; consumers contribute 0.0.

Invariant — avoided-cost duality. The source side and the sink side of the CON channel come to the same number: Σ source_adapters_avoided_cost_rates == Σ sink_adapters_avoided_cost_rates + home_base_load_avoided_cost_rate. Never add the two sides together — that double counts every saved euro.

Corrections apply to prices, not to results​

A device's correction factor is current_lcoe / default_lcoe — it restates what that device's energy costs after its lifetime figures are edited.

Decision: the factor multiplies the lcoe, never the finished number

A saving is served × (tariff − lcoe). Scaling that product by the factor moves it the wrong way: doubling a PV's lifetime cost would double its reported saving, when dearer energy can only save less. The factor belongs on the lcoe inside the bracket, which is where the engine's *_corrected families put it.

The same applies to an operating cost, and worse: a battery's charging cost is a blend of the source devices' prices, so the battery's own factor is not merely misplaced there, it is unrelated.

Decision: accumulated totals persist their price breakdown

A running total mixes prices from several devices, so it cannot be re-corrected from a single scalar. The *_rate_components families split each rate by which adapter's factor scales that part, and the sensor layer accumulates the parts alongside the total. Editing one device's lifetime cost then rescales exactly the share of history that came from it, however long afterwards.

Terms that must never scale — the import tariff, an export compensation — are keyed to the grid, whose correction factor is always 1.0. That keeps every component keyed by a real adapter instead of needing a sentinel.

Totals accumulated before the breakdown existed restore without one. They are carried through unscaled: there is no attribution left to correct them by, and inventing one would be worse than leaving them at face value.

The home base load is a device​

Everything consumed without a sensor on it already takes part in the provenance solve. It is also the largest single consumer in most homes, so dropping it from the results makes the totals look wrong.

Decision: the home base load gets its own properties, not a uid

It is surfaced through dedicated home_base_load_* properties rather than as an entry in the sink_adapters_* dicts. A dict key would need a uid, and any readable uid (home, base_load) can collide with a user's slugified device name — which is exactly why the solver's internal sentinel is "\x00home". Dedicated properties are collision-proof and make the duality invariant above explicit rather than hidden in a magic key.

Prices for a discharging battery​

A battery discharges energy it charged on some earlier mix. The engine is stateless per snapshot, so it cannot know that mix.

Decision: the dynamic price falls back to the flat LCOS on discharge

source_adapters_dynamic_coe / _dynamic_lcoe report the live blended mix while a battery is charging, and the battery's flat LCOS while it is discharging. The marginal (coe) side reads 0.0 on discharge, because the energy cost was already booked at charge time — charging it again here would double count.

The legacy implementation looked no better but was worse: it reported the mix the battery would charge on right now even while discharging, and left an unrestricted battery undefined entirely. Tracking a true running average cost of stored energy is a stateful feature, deliberately deferred; nothing in the savings ledger depends on it, because discharge is valued at LCOS.

Two conventions worth stating​

note
Decision: exports_power=False is a hard routing restriction

It is not a preference about compensation — it is a property of the device or its control software. In Germany a home battery generally may not feed the public grid at all, so a battery configured this way physically cannot supply the EXP channel, and attributing exported watts to it would be wrong rather than merely unpaid.

The exporting grid is therefore a restricted sink: its allowed sources are exactly the sources with exports_power=True. This reuses the existing restriction machinery rather than adding a parallel one, with one implementation caveat — an empty allowed set normally means "unrestricted", but for the export sink it means "nothing may export". That case has to collapse to a stranded, all-zeros row (whole draw reported as a deficit), not silently reopen the whole mix.

Like every restriction, it gives way if no allocation can honour it: a house exporting while only non-exporting sources are running relaxes the restriction and reports the amount through sink_adapters_restriction_deficit, exactly as a "PV only" battery caught charging off the grid does.

Decision: efficiency is measured at the AC port, and nothing needs it

A battery's efficiency describes its AC-side round trip, so conversion losses and parasitics are already inside the metered charge and discharge readings. A DC-coupled meter would need its losses modelled separately; that configuration is not supported.

Efficiency therefore never enters the savings arithmetic. It does not enter LCOS either: a battery's lifetime throughput is the energy it discharges, so the losses are already netted out of it and dividing by efficiency would count them twice. And the dynamic price falls back to the flat LCOS while discharging (above), so it does not need efficiency either.

That left the configured value with no consumer at all, so the field is gone: asking for a number nothing reads is worse than not asking. Existing entries have the stored key dropped by a migration.

Known simplification. Self-consumption is valued at the import price even in a snapshot where the house is exporting, where the true marginal alternative is the feed-in tariff. This is the conventional treatment and matches how the docs describe self-consumption, but it slightly overstates savings during an export surplus.

How the tests pin this down​

The engine tests use the source-order scenario framework (see the tests README). Expected values are hand-derived from first principles, not read back from the engine, so a regression in the model flips a test red rather than silently rewriting the "expected" answer.

Approximation policy. Share and ratio expectations are compared with pytest.approx(..., abs=1e-3) — they must agree to three decimal places (0.1 percentage point). That lets an author write a readable rounded literal like 0.615 for 8/13, while still catching any real regression (which shifts a share by far more than 1e-3 — the home-load bug above moved a share from 0.615 to 0.951). Values that are exact — 0.5, 2/3, 0.625, 0.0, 1.0 — can be written exactly and compared at the default pytest.approx tolerance (relative 1e-6). When you want a share pinned tighter than three decimals, write it as an exact fraction instead of rounding.